Requirements & Charges for New Connection

CAPELCO REQUIREMENTS & CHARGES FOR ELECTRICAL CONNECTION:
REQUIREMENTS FOR NEW CONNECTION
CAPELCO /MUNICIPAL/CITY
  • Application for Membership
  • House Wiring Inspection Report
  • Certification from Area Manager
  • Attend Pre- Membership Orientation Seminar
  • Application for Electrical Permit
  • Electrical Sketch Plan
  • Fire Inspection Certificate
  • Mayor's Permit
  • Bldg. Permit (big houses)
  • Certificate of Occupancy (big houses)
  • Policy 4-11- If leased or rented lot applicant must secure an authority from the owner.
CAPELCO FEES: (Residential & Commercial)
REQUIREMENTS FOR NEW CONNECTION
Membership Fee: PhP 5.00
Inspection Fee: with 12% VAT
Amperes Single phase Three Phase
30 Amperes 168.00 1,000.00
60 Amperes 280.00 1,500.00
100 Amperes 336.00 2,000.00
200 Amperes 392.00 2,500.00
300 Amperes 448.00 3,000.00
400 Amperes   3,500.00
Bill Deposit: (Residential Only) PhP
No. of Outlet Bill Deposit
1 - 3 300
4 - 5 500
6 - 7 700
8 - 10 1,000
11 - 15 1,500
16 - 20 2,000
21 - 25 2,500
26 - 30 3,000
Over 30 5,000
CHARGES: (For Residential New Connection)
Membership Fee 5.00
Inspection 168.00
Bill Deposit: (Minimum) 300.00
Meter Board 150.00
Total 623.00

 

ADDITIONAL/SEPARATE METER:
Kwh Meter Payment: 1,010.00
Inspection fee 168.00
Service Drop Fee 112.00
Meter Board 150.00
Bill Deposit: (minimum) 300.00
Total 1,740.00
TRANSFER OF KWH METER:
Inspection fee 168.00
Service/Relocation Fee/transfer 112.00
Total 280.00
CHANGE OF NAME OF MEMBERSHIP:
Membership Fee: 5.00
Verification Fee: 168.00
Total 173.00
BROKEN GLASS METER CHARGE:
Class 30 200.00
Class 100 500.00
Class 200 1,000.00
KWH METER DEPOSIT:
(FOR COMMERCIAL & INDUSTRIAL CONS.)
kWh meter Payment:
Class 30 1,010.00
Class 100 2,500.00
Class 200 6,800.00

THREE (3) PHASE LINE
Service Fee = Php 1,500.00
Reconnection/Disco. Fee = Php 500.00
Prepared by: MSD: File: Doc. requirements & charges for new connection3