TWO WEEKS OF CONSOLIDATED TEAM ACCOMPLISHMENTS BT 10

Published: May 4, 2024

April 22-May 3, 2024

BT 10 Team Members: G Condino, C Daliva, NM Distura, M Umiten and A Ordas
Accomplished:
1. Continued rehabilitation of lines at Barangay Barra, Roxas City
• Installation of 2 span o/s line
• Transfer/rehabilitation of 20 kilowatt hour meters
2. Installation of temporary connection for brgy. Fiesta, cogon, Panay 1- unit 50 KVA transformer
3. Elevation of service drop lines (parade route for Capiztahan) from Barangay Baybay to Barangay Culasi, Roxas City
4. Installation of 2 service poles and rehabilitation of 12 kilowatt hour meters, Sitio Bagongon, Barangay Culasi, Roxas City
5. Correction of line at Happy Ville, Barangay Sibaguan, Roxas City (low voltage)
• Transfer of transformers 2- units 37.5 and 50 KVA to center loading
• Cut off and installation of dead-end for secondary lines for load balancing
• Correction of loosen secondary jumpers
6. Installation of 3- blade disconnect switch for New Road, Banica line section
7. Correction of line at villa San Lorenzo, Cagay Roxas City (low voltage)
• Transfer of 37.5 KVA transformer to center loading
• Correction of loosen secondary jumpers
8. Replacement of rotten toppled pole and rehabilitation of 5 kilowatt hour meters
9. Continued grounding installation for Feeder B-2 San Antonio Resort line section, Baybay, Roxas City
10. Assisted in the repair of damaged line due to car accident at Barangay Tiza, Roxas City
• Installation of cross arm
• Pull-out of 2 units of damaged poles
11. Replacement of damaged transformer 50 KVA at Philippine Railway St, Roxas City
12. Transfer of connection to new line at Barangay Bolo, Roxas City
• Retirement of 3- span underbuilt lines
• Transfer of kilowatt hour metering
13. Pull out 100 KVA transformer at Panitan Main Office
14. Installation of temporary connection 100 KVA transformer for Panay Municipal Fiesta
15. Energization of 3 units of 75 KVA transformer at Barangay Punta Tabuc, Roxas City
16. Installation of 25 KVA transformer exclusive use for Rose Pharmacy, Poblacion, Ivisan
17. Installation of temporary connection 25 KVA transformer for Lonoy Roxas City Barangay Fiesta
18. Rehabilitation of lines at Camella Homes, Barangay Sibaguan Roxas City (low voltage)
• Energization of 2- unit 37.5 KVA transformer
• Transfer of 37.5 KVA transformer to center loading
• Installation of secondary dead end for load balancing