(0963) 043 8339 info@capelco.com

POST SCHEDULED POWER INTERRUPTION REPORT

Published: May 19, 2024

May 19, 2024, Sunday

Purpose: Hotspot Correction and Preventive Maintenance Servicing of the National Grid Corporation of the Philippines
Chronology of Time and Areas affected:
From 5:05 AM to 8:02 AM
Areas connected at Panitan Substation
• FEEDER 2 – Municipality of Pontevedra (except those connected at President Roxas Substation) portion of the Municipality of Panay and Panitan
From 5:05 AM to 9:04 AM
• FEEDER 4- Portion of the Municipality of Panitan and Municipality of Sigma (Delayed restoration due to broken insulator in the distribution line)
From 5:05 AM to 8:09 AM
Areas connected at Lawaan Substation
• FEEDER 4R- Banica, Tanza, Bato, Mongpong, Culajao, Gabuan, Dumulog, Cogon, Punta Cogon, and portion of San Juan Baybay
• FEEDER 6R- Teodoro Arcenas Trade Center (TATC), San Roque Ext. and Hemingway St.
From 5:05 AM to 8:02 AM
Areas connected at Burgos Substation
• FEEDER B1- Crossing Petron going to sa City Mall, Gaisano Blvd and Arnaldo Blvd Line Section.
• FEEDER B2- City Mall going to Airport, Baybay and Culasi Line Section including San Juan, Baybay
• FEEDER B3- Tanque from St. Marys to St. Francis Subd Line Section, Washington St., Rizal St., and Fuente Acuña.
• FEEDER B4- Dayao, Barra and Libas Line Section.
• FEEDER B5- SM Shoemart Roxas.

Other News

Follow Us

Other Related Posts