(0963) 043 8339 info@capelco.com

POST EMERGENCY POWER INTERRUPTION REPORT

Published: June 12, 2024

Various times and different areas affected

Various Dates, Areas and Causes
ROXAS CITY AREA OFFICE (June 10, 2024, Monday)
From 7:31 PM to 8:05 PM and from 8:55 PM to 10:03 PM
Areas affected:
Opening of different phases in the 3-phase line
Area affected: Barangay Milibili, Roxas City
From 7:34 PM to 8:30 PM
Intrusion of Gecko into the distribution line
Areas affected: Barangay Lonoy, Cabugao, Jumaguicjic and San Jose, Roxas City
From 9:14 PM to 9:30 PM
Open one phase of 3-phase line at Barangay Agmalobo, Ivisan
Areas affected: Barangay Agmalobo, Matnog, Balaring, Basiao and Cabugao
From 9:31 PM to 10:26 PM
Open single-phase line
Areas affected: Barangay Jumaguicjic and San Jose, Roxas City
From 10:29 PM to 11:25 PM
Opening of one phase in the 3-phase line
Areas affected: Barangay Sibaguan and Talon, Roxas City
MAMBUSAO AREA OFFICE (June 10, 2024, Monday)
From 9:34 PM to 9:35 PM
Intrusion of gecko into the distribution line at Barangay Atiplo, Mambusao which affected the main breaker causing power interruption in the 3 municipalities
Areas affected: Municipalities of Mambusao, Jamindan and Sapian
DUMALAG AREA OFFICE
June 8, 2024, Saturday – Disconnected secondary line at Barangay San Nicolas, Tapaz
June 9, 2024 Sunday – Toppled bamboo tree into the distribution line at Sitio Tungguhan, Barangay Wright, Tapaz

Other News

SCHEDULED POWER INTERRUPTION

Date:๐‰๐€๐๐”๐€๐‘๐˜ ๐Ÿ๐ŸŽ, ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ“ (Friday)Affected Areas:๐–๐‡๐Ž๐‹๐„ ๐Ÿ๐๐ƒ ๐ƒ๐ˆ๐’๐“๐‘๐ˆ๐‚๐“ ๐Ž๐… ๐‚๐€๐๐ˆ๐™(EXCEPT...

read more

Follow Us

Other Related Posts