Accomplished:
June 2, 2024, Sunday
1. Replacement of rotten pole/ conversion of structure and rehabilitation of 15 kilowatt hour meters at Barangay Angub, Cuartero w/ BT 11
June 3, 2024, Monday
1. Pole top dressing of 2 units of C-7 structure at Barangay Gabuan, Roxas City
2. Removal of bamboo installation near power lines at San Juan, Barangay Baybay, Roxas City
3. Continued grounding installation at Villa Carmel, Barangay Baybay, Roxas City
June 4, 2024, Tuesday
1. Continued grounding installation at Villa Patria and Altavas Subdivision, Barangay Baybay, Roxas City
2. Assisted configuration of Lawaan Substation including replacement and transfer of connection of Feeders 9R and 8R
June 5, 2024, Wednesday
1. Assist power interruption transfer of load connection of Feeder 7R to 8R and Feeder 8R to 9R at Lawaan substation
2. Installation of conductor cover front of Destiny Church, Mabini Street, Roxas City
3. Continued grounding installation at Severino Subdivision, Barangay Baybay, Roxas City
June 6, 2024, Thursday
1. Withdrawal materials from Panitan Main Office, Timpas, Panitan
2. Pay-out of conductor for 3-phase line relocation at Barangay Gabuan, Roxas city
June 7, 2024, Friday
1. Preparation for power interruption at Burgos Street, Roxas City to include digging for 2 pole holes and 2 units of down guy
2. Pole dressing and installation of pole
June 9, 2024, Sunday
1. Assisted during the power interruption at Burgos Street, Roxas City w/BT 8
• Replacement of steel pole to wood/conversion of structure 2 units of C8 to C-7 sturctures
• Re-tightening feeder jumpers of burgos substation
June 10, 2024, Monday
1. Continued preparation for 3-phase line relocation at Barangay Gabuan, Roxas City
• Pay out conductor wire 4/0 ACSR
June 11, 2024, Tuesday
1. Continued preparation for 3-phase line relocation at Barangay Gabuan, Roxas City
2. Pay out conductor 4/0 ACSR
3. Installation of additional Aerial ground at Lawaan substation
June 13, 2024, Tuesday
1. Replacement of damaged cut out at Crossing Jail, Barangay Lawaan, Roxas City
2. Withdrawal of materials from Panitan main office
3. Replacement of damaged 50 KVA transformer at Philippine Railway Street, Roxas City
4. Installation of additional grounding from Lawaan substation to crossing Capiz Doctors Hospital, Lawaan, Roxas City
June 14, 2024, Wednesday
1. Construction of 3- phase line extension at Pueblo de Panay, Barangay Lawaan, Roxas City
• Dressing & erection of 3 poles 40 ft
2. Installation of exclusive use 15 KVA transformer at Barangay Tanza, Roxas City
June 18, 2024, Tuesday
1. Continued 3- phase line extension at Pueblo de Panay, Barangay Lawaan w/BT 11
• Installation of C7 structure
2. Pull out 3units of 100 KVAR Capacitor
3. Re installation of 3 units of 100 KVAR Capacitr near Pueblo de Panay Market
June 19, 2024, Wednesday
1. Continued preparation for 3-phase line relocation at Barangay Gabuan, Roxas City
• Payout of conductor wire 4/0 ACSR
June 20, 2024, Thursday
1. Installation of 50 KVA transformer for the exclusive use of Regina Escolin at Mabini Street, Roxas City
2. Clearing of mahogany tree front of Banica Elementary School
3. Pole top dressing for rephasing of line at San Juan, Barangay Baybay, Roxas City
June 21, 2024, Friday
1. Installation of 25 KVA transformer temporary connection for San Juan Baybay fiesta
2. Energization of Mr. DIY Building at Arnaldo Boulevard Roxas City w/ m-7 metering crew
• Installation of 3- units 25 KVA transformer
• Termination of 3-power cable line and cutouts
June 24, 2024, Monday
1. Energization of Wilcon Depot , Barangay Lawaan, Roxas City with M7 metering crew
• Termination of 3- power cable line
• Conversion of c-2 to c8 structure
• Installation of ABS switch
• Installation of 3 units of CT and PT meters
June 25, 2024, Tuesday
1. Continued preparation for 3-phase line relocation at Barangay Gabuan, Roxas City
• Dressing and installation of 2 units of C-8 structure
• Replacement of steel pole to wood pole 40 ft.
• Installation of 2 units of down guy
June 26, 2024, Wednesday
1. Continued preparation for 3-phase line relocation at Gabuan, Roxas City
• Dressing and installation of 2 units of poles C-1 and C-8 structure
• Installation of down guy
• Pull out steel pole and replacement of wood pole
2. Assisted in the request of St. Pius X Seminary at Barangay Lawaan, Roxas City
June 27, 2024, Thursday
1. Replacement of damaged 50 KVA transformer at Hercor College, Barangay Lawaan, Roxas City
2. Pull -out idle pole at Barangay Tanza, Roxas City
3. Pull -out temporary connection 25 KVA transformer at San Juan, Barangay Baybay, Roxas City
4. Pole top dressing for rephasing of line at Barangay Gabuan, Roxas City
June 28, 2024, Friday
1. Correction of leaning pole at Barra Roxas City
2. Replacement of damaged 25 KVA transformer c/o Rose Pharmacy at Poblacion Ivisan
3. Pull -out material from Panitan Main Office. Timpas, Panitan
4. Clearing of line at Sitio Pinamasawan, Barangay Ilaya-Ivisan, Ivisan
5. Pull -out of service pole due to construction of drainage at Barangay Mongpong, Roxas City