POST SCHEDULED POWER INTERRUPTION REPORT

Published: July 10, 2024

July 9, 2024, Tuesday

As scheduled: From 4:00 AM to 8:00 AM
Reason: NGCP’S De-energization of CAPELCO Feeders (69KV Panitan-Roxas Transmission Line and Timpas Transformer TR1) to facilitate hotspot correction
Areas affected:
Whole of Roxas City except Barangay Adlawan, Liong, Loctugan, Bago and Olotayan.
• Municipality of Ivisan
• Portion of the Municipality of Sigma (those connected to Feeder 4)
• Municipality of Pontevedra (except those connected to President Roxas Substation),
• Portion of the Municipality of Panitan (connected to Feeder2)
• Portion of the Municipality of Panay (connected to Feeder 2).
CHRONOLOGY
Burgos Substation
• 69 kV Transmission line fr0m 4:07 AM to 6:54 AM
• Main Breaker from 4:07 AM to 6:54 AM
• Feeder B1 from 4:06 AM to 6:54 AM
• Feeder B2 from 4:06 AM to 6:55 AM
• Feeder B3 from 4:07 AM to 6:55 AM
• Feeder B4 from 4:07 AM to 6:55 AM
• Feeder B5 from 4:07 AM to 6:55 AM
Lawaan Substation
• 69 kV Transmission line from 4:08 AM to 6:43 AM
• 20 MVA Transformer from 4:07 AM to 6:44 AM
• Feeder 1R from 4:07 AM to 6:44 AM
• Feeder 2R from 4:07 AM to 6:44 AM
• Feeder 3R from 4:07 AM to 6:45 AM
• Feeder 5R from 4:07 AM to 6:45 AM
• Feeder 8R from 4:07 AM to 6:45 AM
• Feeder 9R from 4:07 AM to 6:45 AM
• 10 MVA Transformer from 4:07 AM to 6:44 AM
• Feeder 4R from 4:07 AM to 6:45 AM
• Feeder 6R from 4:07 AM to 6:45 AM
Panitan Substation
• Transformer 1 from 4:09 AM to 6:49 AM
• Feeder 2 from 4:09 AM to 6:54 AM
• Feeder 4 from 4:09 AM to 6:53 AM