(0963) 043 8339 info@capelco.com

SCHEDULED POWER INTERRUPTION

Published: July 19, 2024

JULY 20, 2024 (Sabado nga adlaw)

1. Ang CAPELCO magapatigayon sang pag saylo sang mga poste.
Alas 6:00 tubtob Alas 10:00 sang aga
LUGAR NGA APEKTADO: Feeder 1- Brgy. Calitan, Anhawon, Cabugao Oeste, Bago Chiquito, Cogon, Calapawan kag Binantuan, Panay.

Samtang, ang Brgy. Adlawan, Loctugan kag Olotayan, Roxas City, porsyon sang Panitan, Brgy. Daga, Bago Grande, Candual, Poblacion Ilaya kag Ilawod, Pob. Tabuc, Linateran, Bato, Tanza Norte, Agojo, Cabugao Este, Ilamnay, Bagacay, Pili, Lomboy, Bonga, Pawa, Lat-asan, Jamul-awon, Navitas kag porsyon sang Butacal maga eksperyensya sang 15 minutos nga Power Interruption bag o mag alas 6:00 sang aga kag dugang nga 15 minutos bag o mag alas 10:00 sang aga.

2. Ang CAPELCO maga ilis sang Insulator kag Rotten Poles kag Cross-Arm
Alas 6:00 sang aga tubtob alas 2:00 sang hapon.
LUGAR NGA APEKTADO: Barangay Lus-onan, Linao kag porsyon sang Magubilan, Panay.

Gilayon man nga ibalik ang kuryente sa ti-on nga matapos ang olobrahon.

Other News

Follow Us

Other Related Posts