POST SCHEDULED POWER INTERRUPTION REPORT

July 27, 2024, Saturday

As scheduled: From 5:00 AM to 6:00 AM
In Actual: From 5:07 AM to 5:54 AM
Reason: NGCP load normalization of CAPELCO President Roxas and transfer of Transformer 2 back to Panitan Substation
Areas Affected: Whole Municipality of Pilar, President Roxas, Maayon and portion of Panay, Pontevedra and Panitan
While power is out due to activities of the National Grid Corporation of the Philippines, CAPELCO personnel conducted hotspot correction at the Panitan Switchyard

Other News

EMERGENCY POWER INTERRUPTION

๐„๐Œ๐„๐‘๐†๐„๐๐‚๐˜ ๐๐Ž๐–๐„๐‘ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐ Date: ๐’๐„๐๐“๐„๐Œ๐๐„๐‘ ๐Ÿ๐Ÿ’, ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ” (Thursday) Affected Areas: ๐…๐„๐„๐ƒ๐„๐‘ ๐…๐Ÿ‘ - Whole...

read more

EMERGENCY POWER INTERRUPTION

๐„๐Œ๐„๐‘๐†๐„๐๐‚๐˜ ๐๐Ž๐–๐„๐‘ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐ Date: ๐’๐„๐๐“๐„๐Œ๐๐„๐‘ ๐Ÿ๐Ÿ’, ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ” (Thursday) Affected Areas: ๐…๐„๐„๐ƒ๐„๐‘ ๐…๐Ÿ‘ - Whole...

read more

EMERGENCY POWER INTERRUPTION

๐’๐‚๐‡๐„๐ƒ๐”๐‹๐„๐ƒ ๐๐Ž๐–๐„๐‘ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐ SEPTEMBER 26, 2026 (Sabado nga adlaw) Ang CAPELCO magapatigayon sang...

read more

Follow Us

Other Related Posts