July 1 – 30, 2024, Whole month of July 2024
BT 10 Team Members: G Condino, C Daliva, NM Distura, M Umiten and A Ordas
Accomplished:
1. Replacement of damage 50 KVA transformer at Sitio Tagudtod, Poblacion, Ivisan
2. Installation of groundings at Capiz National High School
3. Line clearing and rehabilitation of duplex line serving 30 households at Barangay Tanza, Roxas City
4. Line clearing at Villa Carmel, Baarngay Baybay, Roxas City
5. Continued preparation for the three-phase line relocation at Barangay Gabuan, Roxas City to include paying out of conductor 4/0 ACSR 4-wires
6. Replacement of damaged 37.5 KVA transformer at Barangay Cagay, Roxas City
7. Continued preparation for the three-phase line relocation at Barangay Gabuan, Roxas City
• Paying out of 3-span underbuilt line
• Paying out of 3-span primary line and correction of o/s line at Sanecra Subdivision
8. Installation of 15 KVA exclusive transformer of Mr. Cesar Apolinario’s dryer at Barangay Bago Chiquito, Panay
9. Replacement of 50 KVA transformer at Barangay Balaring, Ivisan
10. Line clearing of Narra tree front of Petron at Barangay Mongpong, Roxas City
11. Pole top dressing of C8, C7 & installation of down guy at Barangay Gabuan, Roxas City
12. Continued preparation for the three-phase line relocation at Barangay Gabuan, Roxas City to include paying out of 3-span 4/0 ACSR conductor
13. Continued preparation for the three phase line relocation at Barangay Gabuan, Roxas City
• Dressing of pole C15 structure
• Digging pole hole, pull-out old damage pole
• Installation of down guy wire
14. Assisted during the scheduled power interruption at Barangay Gabuan, Roxas City in the energization of new three-phase line
15. Adjustment of fiber cable line due to fire incident at km1 Barangay Lawaan, Roxas City
16. Pull out of temporary connection 25 KVA transformer at Barangay Basiao, Ivisan
17. Correction of line at Barangay Cabugao, Roxas City
• Installation of additional down guy wire
• Replacement of 1-span open underbuilt line to 1/0 ACSR insulated
18. Replacement of 50 KVA damaged transformer at Barangay Linateran, Panay
19. Replacement of toppled pole at Barangay Dinginan, Roxas City (mano- mano)
20. Re-energized by-pass line at Burgos Substation
21. Troubleshooting and replacement of damaged 50 KVA transformer at Injap Supermart at BLTC, Plaridel Street, Roxas City
22. Replacement of 100 KVA transformer at San Roque Extension, Roxas City
23. Replacement of damaged 50 KVA transformer at Arnaldo boulevard, Baybay, Roxas City
24. Installation of down guy wire at Barangay Punta Cogon, Roxas City
25. Pull out 3-phase power cable at Injap Supermart at BLTC, Plaridel Street, Roxas City (for replacement)
26. Line clearing at Atienza Street, Barangay Tiza, Roxas City
27. Replacement of 50 KVA transformer and termination of 3-phase power cable/ installation of 3-phase cut out, 100 amps at Injap Supermart at BLTC, Plaridel Street, Roxas City
28. Conversion of 3-phase to 1-phase connection 440v at Tops Ice Plant, Lawaan, Roxas City
29. Line clearing of bamboo grass at Calumdon, Barangay Tiza, Roxas City
30. Replacement of burned secondary jumper of 25 KVA transformer at Crossing Jail, Lawaan Roxas City
31. Line clearing of mango tree at Hemingway Street, Roxas City
32. Line clearing and power restoration at Barangay Basiao, Ivisan (due to strong winds)
33. Relocation of line at Sitio Tambak, Dinginan, Roxas City
• Digging and installation of erection of 2 poles
• Installation of 2-down guy and pull-out of idle pole
34. Continued relocation of 1-phase line, Sitio Tambak, Barangay Dinginan, Roxas City
35. Digging and installation of pole A4 structure
36. Line clearing of coconut palm tree
37. Pull-out of toppled pole and transfer of 6 service drop lines and kilowatt hour meters at Barangay Banica, Roxas City
38. Completion of single-phase line relocation at Sitio Tambak, Barangay Dinginan, Roxas City
• Pull-out and transfer of conductor wires to new poles
• Replacement of 1-span open ACSR to tree wire conductor
39. Installation of 45 ft. C8 structure at Barangay Anhawon, Panay
40. Assisted during the scheduled power interruption at Barangay Anhawon to Lus-onan, Panay
• Installation of of 2 poles C2 structure
• Transfer of conductor to new pole and 15 KVA transformer
• Replacement of 2 units of C1 structure Barangay Lus-onan, Panay
41. Line clearing Operation
• Barangay Inzo Arnaldo, San Roque Street O/S line FB complaint
• Barangay Dayao, Roxas City coconut palm tree
• Line clearing at Alcazar Subdivision, Hemingway Street, Roxas City mango tree
• Block 6, NHA Tiza, Roxas City, Narra tree branches
42. Replacement of rotten pole and rehabilitation of 10 kilowatt hour meters at Capricho 2, Barangay Tanque, Roxas City
43. Relocation of line due to construction of new building at Wilar Address, Punta Tabuc, Roxas city
44. Replacement of damaged 25 KVA transformer at Sitio Guimba, Barangay San Jose, Roxas City (mano-mano) w/ R Dili crew
45. Assisted the request of St. Pius Seminary, Lawaan Roxas City
46. Assisted the request of ODM, Barangay Tiza, Roxas City
47. Line clearing at Rio Grande Subdivision, Single-phase lines
48. Line clearing at Sitio Paon, Cogon, Roxas City rubber tree request of Maria Dela Torre
49. Installation of 50 KVA transformer c/o Pedro Celino Poultry at Barangay Cudian, Ivisan, secondary metering W/ M7 team
50. Assisted request of Capiz National High school for line clearing various trees and vegetations inside the school campus
51. Energization of 50 KVA transformer for the exclusive use of Regina Escolin at Mabini Street, Roxas city
52. Line clearing at Barangay Candual, Panay, coconut palm and bamboo grass
53. Line clearing at Pueblo de Panay, Barangay Dinginan, Roxas City for various trees
54. Installation and termination of 3 units of 75 KVA, 440V at Tops Ice plant, Lawaan, Roxas City
55. Installation of intermediate pole at Villa Carmel Subdivision, Barangay Baybay, Roxas City
56. Replacement of rotten pole and rehabilitation of 16 kilowatt hour meters at Sto Nino, Barangay Baybay, Roxas City
57. Relocation of pole and rehabilitation of 11 kilowatt hour meters at Barangay Tanza Norte, Panay
58. Rehabilitation of lines at Barangay Daga, Panay
• Installation of 1 additional pole
• Installation of 2- span duplex o/s line &
• Transfer of 7 kilowatt kilowatt hour meters and service drop lines
59. Installation of intermediate pole at Sitio Guimba, Barangay San Jose, Roxas City A-1 structure, mano- mano
60. Line clearing from Barangay Cabugao to Barangay San Jose, Roxas City 3- phase line section
61. Pull out of 2 units 35 steel pole (idle pole)