POST EMERGENCY POWER INTERRUPTION REPORT

September 4, 2024, Wednesday 4:16 PM to 4:50 PM

Areas affected: Municipalities of Pilar, President Roxas, Maayon, Panay, portion of Pontevedra, Panitan and Barangays Adlawan, Liong, Loctugan, Bago and Olotayan, Roxas City
Cause: Disconnected primary line that got entangled with an excavator at the Boundary of Barangay Adlawan, Roxas City and Barangay Salocon, Panitan estimated to be about 10 meters from the bridge
Chronology:
4:16 PM Power Out
4:33 PM power restored to Feeder 3, L1, L2 and L3 โ€“ Municipality of Maayon, Pilar, President Roxas and portion of Panitan and Pontevedra
4:50 Power restored to Feeder 1 โ€“ Municipality of Panay and Barangays Adlawan, Liong, Loctugan, Bago and Olotayan, Roxas City

Other News

EMERGENCY POWER INTERRUPTION

๐„๐Œ๐„๐‘๐†๐„๐๐‚๐˜ ๐๐Ž๐–๐„๐‘ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐ Date: ๐’๐„๐๐“๐„๐Œ๐๐„๐‘ ๐Ÿ๐Ÿ’, ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ” (Thursday) Affected Areas: ๐…๐„๐„๐ƒ๐„๐‘ ๐…๐Ÿ‘ - Whole...

read more

EMERGENCY POWER INTERRUPTION

๐„๐Œ๐„๐‘๐†๐„๐๐‚๐˜ ๐๐Ž๐–๐„๐‘ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐ Date: ๐’๐„๐๐“๐„๐Œ๐๐„๐‘ ๐Ÿ๐Ÿ’, ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ” (Thursday) Affected Areas: ๐…๐„๐„๐ƒ๐„๐‘ ๐…๐Ÿ‘ - Whole...

read more

EMERGENCY POWER INTERRUPTION

๐’๐‚๐‡๐„๐ƒ๐”๐‹๐„๐ƒ ๐๐Ž๐–๐„๐‘ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐ SEPTEMBER 26, 2026 (Sabado nga adlaw) Ang CAPELCO magapatigayon sang...

read more

Follow Us

Other Related Posts