WEEKLY AND JOINT TEAM ACCOMPLISHMENTS BT 8, TSD METERING, LINEMEN TRAINEES

Published: December 1, 2023

November 28 to December 1, 2023, Tuesday to Friday

BT 8 Team Members: G Condino, C Daliva, E Dublado, NM Distura, M Umiten and A Ordas
M 7 Team Members: E Dumagpi, KL Longno, J Dipon and G. Rendon
Accomplished:
1. Assisted in the repair of cut off jumper of 2-phase line at Amado Lim line section, Roxas Avenue Roxas City
2. Installation of temporary connection for Sinadya 2023 with M-7 crew
• 75 KVA transformer for Roxas City Bandstand
• 75 KVA transformer for People’s Park, Baybay
• 50 KVA transformer for provincial park lightings
3. Continued grounding installation correction and line clearing, Mongpong, Roxas City
4. Installation of 50 KVA transformer for 7-11 at Burgos Street, Roxas City with M-7 crew
5. Installation of 37.5 temporary connection the lightings for Municipality of Ivisan
6. Assisted in the relocation of poles during power interruption at Poblacion, Ivisan with BT 5, BT 7 and BT9
7. Energization of new connections with M-7 crew and BT-5 for the Mercury Drug Store Roxas, Arnaldo Boulevard, Roxas City (3 units of 37.5 KVA transformer and power cable termination)
8. Energization of new connections with M-7 crew at People’s Park, Baybay, Roxas City
• 3 units of 50 KVA transformer and power cable termination
• 3 units of 75 KVA transformer and power cable termination for the fountain