PREPARATORY ACTIVITY FOR THE ENERGIZATION OF 15 MVA POWER TRANSFORMER AT DAO SUBSTATION
June 1, 2024, Saturday Accomplished: 1. Installation of 1 span 3phase line @ Dao substation to energize Dao from Feeder 4 Panitan Substation via looping connection 2. Connection of jumper from 13.2 to 69 kV at bypass road Barangay Amaga, Sigma to energize Dao from...
POST SCHEDULED POWER INTERRUPTION REPORT
June 1, 2024, Saturday Reason: The National Grid Corporation od the Philippines (NGCP) will facilitate the replacement of wooden poles along the along 69KV Panitan-Sara line section Areas affected and time: As scheduled: from 5:00 AM to 6:00 PM In actual: from 5:09 AM...
LOW VOLTAGE ALERT ANGUT SA GINAPATIGAYON NGA PAGKAMBYO SANG POWER TRANSFORMER SA DAO SUBSTATION
Ang ginapatigayon nga pagbaylo sang 10 MVA nga Power Transformer sang bag-o nga 15 MVA Power transformer sa Subtation sang Dao nagdulot sang abnormalidad sang boltahe sang kuryente sa banwa sa Cuartero, Dumarao, Dumalag kag Tapaz. Ginpanugyan sang CAPELCO nga sundon...