PARALLEL ACTIVITIES WHILE THE 15 MVA IS BEING PREPARED FOR ENERGIZATION AT DAO SUBSTATION
June 1, 2024, Saturday Making use that power is out at Dao Substation, the construction crew conducted their own activities accomplishing the following: • Relocation of 3-Phase line at Sitio Utod, San Miguel, Dumalag (FB Complain) • Insertion of pole at Barangay San...
PREPARATORY ACTIVITY FOR THE ENERGIZATION OF 15 MVA POWER TRANSFORMER AT DAO SUBSTATION
June 1, 2024, Saturday Accomplished: 1. Installation of 1 span 3phase line @ Dao substation to energize Dao from Feeder 4 Panitan Substation via looping connection 2. Connection of jumper from 13.2 to 69 kV at bypass road Barangay Amaga, Sigma to energize Dao from...
POST SCHEDULED POWER INTERRUPTION REPORT
June 1, 2024, Saturday Reason: The National Grid Corporation od the Philippines (NGCP) will facilitate the replacement of wooden poles along the along 69KV Panitan-Sara line section Areas affected and time: As scheduled: from 5:00 AM to 6:00 PM In actual: from 5:09 AM...